Winding Machine Installation Environment And The Use Of Requirements
Jun 09, 2017

Winding Machine installation environment and the use of requirements
Of the large-scale Winding Machine design factory generally have a base, directly installed on the ground, high-quality cast iron base, its role is to ensure that the Winding Machine to the ground to the heart, to improve the stability of the Winding Machine and reduce the Winding Machine Vibration at work. When the Winding Machine is installed in the correct way on the appropriate foundation, the Winding Machine can not produce the deformation, wear and vibration due to the high speed operation, so it can keep the body rigidity and coil quality of the Winding Machine for a long time.

Small and medium-sized Winding Machine, you need a relatively strong workstations, the need for the installation of the table should be appropriate to install the appropriate shock absorber, if the Winding Machine installation fulcrums and the number of improper distribution or fixed method is unreasonable, it will affect the machine Performance and longevity. For the use of Winding Machine business, the requirements of the site is to build suitable for winding equipment and placement of the foundation or workstations to meet the Winding Machine on the location of the environment requirements, the specific requirements are generally the following:
1. Winding Machine table and foundation must be with the type of Winding Machine base to adapt, and to ensure that the installation of the Winding Machine is firm and reliable, to ensure a reliable grounding around the equipment to ensure that there is no large interference around the source The
2. Winding Machine table and foundation should have sufficient strength and stiffness, to avoid Winding Machine high-speed dynamic vibration generated when the Winding Machine to ensure that the vibration does not affect their own accuracy and life, not shock and affect the coil Quality, adjacent equipment and buildings should not have a bad effect on the Winding Machine.
3. Winding Machine table and foundation should have stability and durability, waterproof anti-skid and harmful objects of the erosion, to ensure that no deformation or local subsidence. When the Winding Machine is placed in an environment where it is possible to withstand chemical liquids, fluids or corrosion, the foundation shall be covered with a protective layer. For example, the surface of the foundation coated with anti-acid, oil-resistant cement mortar, and set drainage, collecting groove.
4. The center of gravity of the Winding Machine and the center of gravity of the workbench and foundation are located on the same vertical line as the centripetal force of the foundation.
5. Large-scale Winding Machine foundation should be pre-installed before the machine is installed. The quality of the preload is 1.25 times the total mass of the Winding Machine and the sum of the maximum mass of the customer workpiece. Preload can be made of steel, sand and small stones. Preload should be evenly pressed on the foundation to ensure that the foundation is evenly sinking. Preloading work to be carried out to the ground no longer continue to sink so far. Many customers do not realize that the use of Winding Machine environment on its performance has much impact. It is necessary to implement strict control of the environment, such as temperature, humidity, dust, vibration and so on. The arrangement of Winding Machine should be easy to process the process and standardize the transportation of raw materials and semi-finished products. And storage, a good and reasonable equipment working environment not only to ensure the quality of the coil beneficial to the maintenance of the Winding Machine is also very good.